A network's critical function is rarely its largest

PublishedNov 23, 2026Read3 minJournalQuincus core

On November 18, gCaptain reported that the Pacific Maritime Association, which represents terminal operators and ocean carriers on the US West Coast, had warned that about 250 port security workers at Los Angeles and Long Beach could strike from 12:01 a.m. on November 21, when their contract extension expired. By the association's figures, the workers are about 2 percent of the union workforce at the 2 ports, and they staff the gates at 6 container terminals that handle more than half of the complex's cargo. Bloomberg reported the same day that the union had not replied to a request for comment.

However the talks ended, the numbers describe something true of every network. 2 percent of the people, more than 50 percent of the flow.

Capacity in series is a minimum, not a sum

A container terminal is a chain of functions: berth, crane, yard, gate, and at the gate the checks that let a truck and its driver in. The functions sit in series, so the throughput of the terminal is the throughput of the slowest one. A terminal with cranes for 10,000 moves a day and a gate that is closed handles 0 gate moves, and within days handles few crane moves either, because the yard fills.

Planning attention tends to follow cost. Cranes, berths and yard equipment are the large capital items and the large labor pools, so they get the models, the dashboards and the redundancy. The gate check is a small line in the budget. But a function's share of cost says nothing about its share of risk. 2 questions matter: does all flow pass through it, and is there a substitute.

A test for a small critical function

Take an illustrative terminal. For each function, write down 3 numbers: the share of flow that depends on it, the time to substitute it if it stops, and the buffer, in hours, that the neighboring functions can absorb before they stop too.

  • A crane: 1 of 12 on the quay, so about 8 percent of flow, and the other 11 can cover part of the gap.
  • A yard block: perhaps 10 percent of flow, with overflow to neighboring blocks.
  • Gate credential checks: 100 percent of truck flow, no substitute on the day, and a buffer equal to the free space in the yard.

Rank by cost and the gate check is near the bottom. Rank by flow share multiplied by time to substitute and it is at the top. The 2 rankings are almost unrelated, and in the operations we have seen, resilience spending follows the first one.

Where else this hides

Most networks have a version of this. An airport cargo terminal can depend on a handful of screening lanes. A border crossing for live animals can depend on 1 inspector's shift. A pharmaceutical warehouse can depend on the 2 people qualified to release a batch. A port community can depend on a single interface to a customs system. None of these appears on a capacity chart, because capacity charts draw the big assets.

The function that stops a network is often one nobody modeled, because it was too small to appear in the budget.

Finding them is not expensive. It needs a map of the network drawn by dependency instead of by cost, and a walk through it asking what stops if this stops, and for how long. The answers decide where cross-training, standby arrangements and buffers are worth paying for.

The number to keep

2 percent of the workforce, more than half of the cargo. That ratio belongs to 1 port complex in 1 week. The pattern is general: in a series system, importance is set by position, not by size. A plan that sizes its attention by headcount or by capital has measured the wrong thing.

Journal

New essays by email.

One email when a new essay is published. Nothing else.

By subscribing you agree to our privacy policy.

If your network makes decisions under uncertainty, we should talk.

We work with a small number of operators at a time. Tell us what your network is optimizing for.

Start a conversation