A canal sells 2 things: a slot and a depth

PublishedNov 17, 2026Read3 minJournalQuincus core

On November 11, gCaptain reported that the Panama Canal Authority, in a November 9 advisory to shipping, raised daily transit capacity from 33 to 34 vessels by adding a booking slot for Super category Panamax vessels, and raised the maximum authorized draft at the Neopanamax locks to 15.24 meters, or 50 feet, effective immediately and until further notice, citing improving lake levels. The same report noted that the draft had been 49 feet since October, and that daily transits fell to 22 at the low of the 2023 to 2024 drought.

Those are 2 different kinds of capacity, and a planner should treat them differently, because 1 is bought and the other is forecast.

Slots times depth

The throughput of a lock canal is the number of transits it can water per day multiplied by the cargo each transit carries. The second term is set by draft, because a ship loads to the limit it expects to meet at the canal, and every foot it cannot use is cargo left on the quay at origin.

Last week's advisory moved both terms by a small amount. 1 more slot on 33 is about 3 percent more transits. 1 more foot on 49 is about 2 percent more draft on each of the 10 Neopanamax transits, and because the hull's own weight is fixed, the extra foot is worth more than 2 percent of the cargo on board. The 2 increments look alike in size. They behave nothing alike in a plan.

The slot is a sequencing problem

A slot is allocated. The authority's advisory described how: transits from November 12 to 17 through the auction, November 18 to 23 through a special competition period, and from November 24 through the regular booking period. A vessel without a booking waits.

That makes the slot a sequencing decision with a price. The operator chooses whether to buy certainty at auction, wait for the regular window, or arrive unbooked and queue. The cost of the queue is the vessel's daily hire plus the cost of a missed berth window at the next port. On an illustrative vessel costing 40,000 dollars a day, a 3-day unbooked wait is 120,000 dollars, which is the most the operator should rationally pay at auction for the certainty of transiting on time. The canal, for its part, sequences the vessels it has admitted to maximize transits against the water each lockage consumes. Both sides are solving ordering problems, and both change when the count moves from 33 to 34.

The depth is a forecasting problem

Draft is not allocated. It is announced, and it binds at a moment the operator cannot choose. A ship that will reach the canal in 3 weeks loads today against a limit that is in force until further notice. If the limit is cut before arrival, the ship lightens cargo at a port it did not plan to call, or it transits with cargo it has already paid to carry and cannot. If the limit is raised after loading, as it was last week, the ship arrives with a foot of unused water under it.

So the loading decision at origin is a bet on a hydrological forecast. The right load is not the current limit. It is the limit the planner expects to hold 3 weeks out, weighted by what a cut would cost against what an unused foot is worth. In a year with a real chance of drought, that number sits below the published figure.

Model them separately

A canal publishes 2 numbers and a plan should carry 2 variables: a slot, priced and sequenced, and a depth, forecast and hedged. A model that folds them into 1 capacity figure will be wrong the way averages are always wrong: it describes a canal that never exists on any given day.

Journal

New essays by email.

One email when a new essay is published. Nothing else.

By subscribing you agree to our privacy policy.

If your network makes decisions under uncertainty, we should talk.

We work with a small number of operators at a time. Tell us what your network is optimizing for.

Start a conversation